Hubei entry-exit Inspection and Quarantine Bureau
PROJECT DETAILS
Classification:
Hubei entry-exit Inspection and Quarantine Bureau Inspection and Quarantine Technology center laboratory renovation project
The total construction area is 21,000 square meters, and the laboratory area is 10,000 square meters. The laboratory maximizes the use of internal space through integrated pipeline balancing technology, while meeting usage requirements and ensuring safety. In particular, the constant temperature and humidity laboratory adopts self-developed innovative control technology to achieve high-precision temperature and humidity control.