Centre Testing International Group Co., Ltd.
PROJECT DETAILS
Classification:
Huatang Group headquarters building laboratory process system engineering
Laboratory process system engineering project of Huatai Group Headquarters Building (Total amount of the project: 21.38 million yuan), the laboratory area is 9600 square meters, the overall design is combined with the building structure, the use of intelligent management system, the laboratory data collection, temperature and humidity, ventilation system operating status, instrument and equipment safety alarm, gas fire leakage alarm, real-time video surveillance monitoring and other comprehensive management, the construction content includes: Laboratory furniture, fume hood, universal exhaust hood, laboratory air circuit, ventilation and exhaust air, automatic control part, cold and heat source, equipment electrical engineering, equipment water supply and drainage engineering.