Weihai City food and drug testing center
PROJECT DETAILS
Classification:
Weihai Food and Drug Testing Center Laboratory Project (Construction)
Construction began in December 2017, 18 years in May officially put into use, the laboratory has a total of five floors, one of which is mainly office, sample, hall and power facilities, the second, third and fourth floors are mainly physical and chemical laboratories, a small part of the instrument room office area.
The fifth floor is the purification laboratory, including PCR laboratory, microbiology laboratory and related auxiliary rooms and equipment rooms. Since it was officially put into use in 18 years, there has never been any substantive failure, and it has been running well. We have mainly done the overall decoration of this laboratory, water supply and drainage, strong and weak electricity, HVAC engineering, exhaust engineering, purification engineering, sewage treatment engineering, fresh air engineering, waste gas treatment engineering, pure water engineering, etc., which is a turnkey project.